As part of a long-range master plan, 2008-09 will see the City continue to reinvest in its infrastructure, particularly in the area of landscaping and streetscapes described below:
2007/08 Projects
Re-landscaping of Agoura Road medians:
Project involves the reconstruction of center medians on Agoura Road with new irrigation, landscaping and drainage.
The budget for this project is $600,000.
2008/09 Projects
Re-landscaping of Triunfo Canyon Road medians:
Project involves the reconstruction of center medians on Triunfo Canyon Road with new irrigation, landscaping and drainage.
The budget for this project is $765,000.
Agoura Road Median Lighting
Lighting will be provided to monument and advance street name signs located within the median. Total budget - $40,000
New Irrigation Controlers
The City began implementing a City-wide, centrally located irrigation control system in 2007. The implementation is in the second year of a five year roll out plan. Total budget for 2008/09 is $350,000.
City-Wide Sidewalk Replacement Program
The sidewalk replacement program will asses missing sidewalk sections throughout the City and propose construction within the missing sections. The first segment of sidewalk to be constructed will be along Lindero Canyon Road from Thousand Oaks Boulevard and the Guitar Center Driveway. Total budget - $350,000.
|
|
Representng a collaborative effort involving the Triunfo YMCA and the Canyon Oaks Homeowner’s Association, this approved project is currently in the design stage and will be built in two phases with the development of a graded level pad to come first, followed by the construction of above-ground improvements such as backstops, play fields, restrooms, etc. on eight acres. It is expected that grading of the pad, with construction of utilities and driveway, will commence in mid 2009 and be completed approximately twelve to fifteen months later. Construction of the above-ground improvements for the second phase will follow, although it has currently not been determined when that will occur as the City will be seeking additional funding opportunities through grants and fund-raising activities to offset overall project costs.
The budget for the first phase of the project is $3,595,500. |
Three phases of work remain to be built as part of this project, including: (Phase 1) widening for a second northbound on-ramp lane next to the new Four Seasons Hotel and extension of the auxiliary lane adjacent to the freeway; (Phase 2) realignment of the travel lanes on the overpass and addition of an additional southbound lane; and (Phase 3) improvements at the Lindero-Agoura Road intersection resulting in a second westbound right turn lane and a second eastbound left turn lane. It is expected that construction of these phases will occur over a three-year period beginning in the spring, 2009. The budget for this program is $7,839,000. |
As part of the City’s on-going road resurfacing program, the following streets are targeted for either an overlay or slurry seal coat in spring or early summer 2009:
Overlay Specific streets in the First Neighborhood.
Slurry Seal - Lindero Canyon Road between Agoura Road and Via Colinas, Agoura Road between Lindero Canyon Road and western City limits, and the southerly half of the First Neighborhood.
The budget for this program is $1,025,800. |